Huachi Zifangpan 50MW Wind Power Project was Connected to the Grid
08-10-2022 Ganqing Company

On September 30, Huachi Zifangpan 50MW Wind Power Project of CR Power was successfully connected to the grid.

The project, located in Huachi County, Qingyang City, Gansu Province, plans to install 12 wind turbines. After connecting to the grid, it is expected to have a power capacity of 110 million kWh, save about 33,000 tons of standard coal and reduce about 64,000 tons of carbon dioxide emissions on an annual basis.