On August 18, the first 10MW wind generation unit in Cangnan No.1 offshore wind power project of China Resources Power was hoisted successfully.
The hub of 10MW wind generation unit is 127m high. The impeller diameter and the length of a single blade are 210m and 102m, respectively. The successful hoisting means the first commercial application of 10MW large blade model with the typhoon resistant function has been realized in China, which will play a far-reaching role in offshore wind power construction in the fair price era.