At 15:58 on June 11, Jinjiang Technology Rooftop Distributed Photovoltaic Project of CR Power Southeast China Region was successfully connected to the grid for power generation.
The project is located in Fujian Jinjiang Science and Technology Co., Ltd., with a total roof area of about 80,000 square meters and 8.122MWp for this phase, which is expected to provide 8.3 million kWh of clean energy annually, save 2,500 tons of standard coal and reduce 6,800 tons of carbon dioxide emissions. Actively helping customers save energy and reduce emissions, the project has a remarkable demonstration effect in the local textile industry, helping CR Power Southeast China Region to get its new energy business off the ground in Changle, Fuzhou.
The COVID-19 unexpectedly broke out during the construction of the project, and Fuzhou Changle Airport near the construction site was the forefront of the battle against the epidemic in controlling the entry of the personnel from outside Fujian Province. The project construction management team actively responded to the relevant requirements of the government and the enterprise on epidemic prevention and control, and strictly took protective measures such as personnel isolation, office disinfection and health publicity, demonstrating its sense of responsibility as a Central enterprise during the special period.