On April 25, the groundbreaking ceremony of China Resources C'estbon Ningxiang Zero-carbon Factory Phase I: Distributed PV Project was held in Ningxiang City, Hunan Province.
With Building Integrated PV (BIPV), the installed capacity on the DC side of the project shall be 14.596MWp and the capacity on the AC side shall be 10.995MW. About RMB 60 million will be invested in the construction, with an average annual power generation of about 13.44 million kWh.