On December 13, the first batch of wind turbines for Longhu 200MW Wind Power Project Phase II of Integrated Wind-Storage Wind Farm of CR Power in Yingcheng, Hubei was grid-connected. With a total investment of RMB 1.2 billion, this wind power project Phase II enables annual on-grid energy of about 388 million kWh, and can save 119,900 tons of standard coal and reduce 327,500 tons of CO2 emissions on an annual basis.