Main Building of CR Power Fengrun Power Plant Realizes Full 5G Signal Coverage
24-03-2021 Tangshan Company

 

The main building of CR Power Fengrun Power Plant (hereinafter referred to as "Fengrun Project") realized full 5G signal coverage on March 19.

Fengrun Project is the first power plant under CR Power to achieve full 5G signal coverage, marking that the innovation platform and R&D environment co-built by Fengrun Project and China Resources Power Technology Institute has been preliminarily set up.

5G signals are characterized by high security, low latency, large bandwidth, and multiple concurrent transmission, which can benefit industrial scenario applications that have been put into production. The main building of Fengrun Project now has full 5G signal coverage, with average SSB RSRP of 60 dBm to 80 dBm, average rate of 820 Mbps and maximum rate of 850 Mbps.

Fengrun Project will next gradually explore the full 5G network coverage for specific scenario applications and build a smart interconnected modern power plant that is efficient and energy-saving and has a green and comfortable environment.