At 20:16 on April 7, all units of the 40MW wind power project of CR Power in Fengqiu, Anyang, were successfully connected to the grid.
Fengqiu Wind Power Project is located in Fengqiu County, Xinxiang City, Henan Province. 16 wind power generators with a single unit capacity of 2.5MW were installed. It is the first wind power construction project in the region to obtain government permission to resume work since the Central government called for resumption of production and work. Built with 140-meter-high all-steel flexible towers, the unit fan is currently the "highest" fan that CR Power has built and put into operation.